Too many and not enough time….

Reworking a bathroom…a pipe 🙂 dream requiring a great deal of planning before actual work.

Cleaning a barn loft (shades of a modern Augean Stables, only with bats and cats added), which would really be best done when it is below freezing so as to reduce the Odor.

Building some Tree Swallow boxes, a bit of lighthearted frivolity and a lesson in basic carpentry.

And in a month or two, gardens!

In the meantime, snow perhaps. At least the drive is clear. Thanks to the tractor driver!